Register to post in forums, or Log in to your existing account
 

Play RetroMUD
Post new topic  Reply to topic     Home » Forums » zMUD General Discussion
dealingace
Newbie


Joined: 30 Sep 2004
Posts: 1

PostPosted: Thu Sep 30, 2004 8:02 pm   

Calling one speedwalk from another speedwalk
 
Just trying to save some time typing and if basic directions change, I want to see if you can call one speedwalk from inside another speedwalk.

IE

Center of Town to Gate = ctog

Speedwalk to well= ctog;e3s4e2n

Or something like that. That way, you can have multiple paths that use the first part without having to retype it everytime.

Thanks ahead of time.
Reply with quote
LightBulb
MASTER


Joined: 28 Nov 2000
Posts: 4817
Location: USA

PostPosted: Wed Oct 06, 2004 6:25 am   
 
Put a period in front of the pathname.
.ctog;e3s4e2n
_________________
LightBulb
Senior member

Most scripts in this forum are written for Command Line entry.
Don't even open the Settings Editor unless its use is specified or obvious.
Reply with quote
Display posts from previous:   
Post new topic   Reply to topic     Home » Forums » zMUD General Discussion All times are GMT
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum

© 2009 Zugg Software. Hosted by Wolfpaw.net